Repair and reconstruction in Baku-Tbilisi-Ceyhan pipeline
Transportation of 9, 6 million barrel oil was suspended due the shut down of the pipeline during last days.

BTC pipeline closed due to fire in Turkish sector started repair and reconstruction. Repair and reconstruction will finish and oil flow will resume within 10-15 days. The blaze, which hit Baku-Tbilisi-Ceyhan (BTC) pipeline earlier in August near Refahiye in Erzincan province, disrupted oil flow. 800 thousand barrel oil exported daily through BTC before the fire. Transportation of 9, 6 million barrel oil was suspended due to the shut down of the pipeline during last days. BTC is a crude oil pipeline that covers 1,768 km1,099 miles) from the Azeri-Chirag-Guneshli oil field in the Caspian Sea to the Mediterranean Sea. It is the longest oil pipeline in the world. 

© 2008 Bütün hüquqlar qorunur. Xəbərlərdən istifadə edərkən ANS-PRESS-ə istinad zəruridir.


Xəbər anspress.com tərəfindən təqdim edilib.: http://www.anspress.com

Tarix: 18.08.2008 23:36

© anspress.com